Northern Marmara (3rd Bosphorus Bridge Included) Highway ProjectNorthern Marmara (3rd Bosphorus Bridge Included) Highway Odayeri-Pasakoy SectorPROJECT INFORMATION
- Administration: Türkiye Cumhuriyeti Karayolları Genel Müdürlüğü
- Employer: ICA İçtaş - Astaldi Adi Partnership
- Concrete Quantity: V6: 26.000m³ - V14: 15.000m³ - V17: 34.000m³
- Length: V6: 480 mt-max. Opening 50 mt - V14: 460 mt max. Opening 55mt - V17: 672mt-max. Clearance 52mt
- Preliminary Beam Quantity (pieces): Push-Riding
-
V4 Viaduct Ankara-İstanbul High Speed Train Project2400 mt. turnkey construction project of Turkey's longest viaductPROJECT INFORMATION
- Administration: T.C. Devlet Demiryolları
- Employer: OHL (Spain)
- Width: 66 mt
- Concrete Amount: 175.000 m3
- Rebar Amount: 25.000 Ton
- Beam Amount: 792 pcs
-
River Crossing Bridges and State Road Overpass Bridge Ankara-Istanbul High Speed Train ProjectProduction-Transportation-Installation of beams for 13 river crossing bridge, casting of concrete bridge slab and turn-key construction of government overpass bridge.
-
Edirne - Meric High Speed Train Project - V4 ViaductTem Edirne - Karaağaç Connection Road Viaduct (2185mt)
-
Çakıt 1 - Çakıt 2 Viaducts Ankara - Pozantı Highway Çiftehan - Pozantı CuttingTurnkey construction of a 1050 mt double-lane freeway viaduct.PROJECT INFORMATION
- Administration: T.C. Karayolları
-
Turkmenistan Bridges Türkmen Avtoyolları Devlet Kurumu Highway BridgesConstruction work of 186 highway bridges.
-
Ready Mixed Concrete and Precast Beam Supply Ankara - Pozantı Highway Çiftehan-Pozantı CuttingProduction, transportation and erection of prestressed beams of all works within the scope of the employer and ready-mixed concrete installation.PROJECT INFORMATION
- Administration: T.C. Karayolları
-
Kazakhstan / Astana NPOEKT MOCT M 1 ProjectKazakhstan / Astana in Kazakhstan / Ceylan Construction under the NPOEKT MOCT M 1 Project, prefabricated prefabricated concrete beam production, transfer and assembly and other precast elements.
-
Baku-Tiflis-Ceyhan Oil Pipeline - Ceyhan Marine Terminal ConstructionBaku-Tiflis-Ceyhan oil pipeline Prefabricated precast beams for construction purposes completed by Tekfen Construction equipment and transport.
-
Feke II HEPP ProjectProduction, transport and erection works of prestressed beams belonging to Viaduct constructions under Feke II HEPP Project.
-
Nizip, Nailbey and Fırat ViaductsGaziantep-Şanlıurfa highway The assembly of the omega beams of 160 tons of Nizip, Nailbey and Fırat viaducts carried out in the joint venture of Tübin-Tekfen-Özdemir with launching girder.
-
Artvin Borcka DamMounting of the prefabricated projected beams of Artvin Borcka Dam and HEPP Construction by Yüksel İnşaat with launching girder.
-
Botan BridgeSerefoglu Construction built by the launching girder of steel beams belonging to Botan Bridge in Siirt Province.
-
HirfanlıInstallation of prefabricated beams belonging to Zagnos Tabakhane bridges in Trabzon city crossing road construction area
-
Ankara Keçiören Cumhuriyet KulesiKecioren Municipality is the turn-key construction work for the construction of "Cumhuriyet Kulesi" (190 mt height).
-
Çankırı Karatekin University Building Reinforcement and RestorationÇankırı Karatekin University Faculty of Economics and Administrative Sciences. and Faculties of Fine Arts service building strengthening and renovation restoration work.
-
Kızılırmak Hirfanlı ProjectThe Kızılırmak, Hirfanlı Dam Variant project, which was constructed by the 6. Regional Directorate of Highways, consists of a total of 292 mt length, 7 openings and 84 pre-stretch I-180 beams.