Design and execution of the route diversion works located between km 10+009– km 12+000 and km 21+406– km 24+890 of Romania Brașov-Târgu Mureș-Cluj-Oradea Motorway subsection 3A2: Nădășelu - Mihăiești (km 8+700 – km 25+500)
PROJECT INFORMATION
Turnkey construction of 6 km road project which includes two viaducts with one-way 1.2 km and 2 km in length on the Nadaselu – Mihaiesti section of the Transylvania Motorway (A3). The two sections of the 1.2 km viaduct are constructed by balanced cantilever method.
Completed
PROJECT INFORMATION
- Administration: Romania National Company for Road Infrastructure Administration (CNAIR)
- Contractor: ÖZALTIN İNŞAAT TİCARET VE SANAYİ ANONİM ŞİRKETİ & ILGAZ İNŞAAT TİCARET ANONİM ŞİRKETİ & VISIO CONSTRUCTION WORKS S.R.L